Aerial view of Port Moody's shoreline, rail corridor, and residential streets

The process

The multiplex permit process, step by step

SSMUH removed the rezoning, not the review. Here is the road between a decision and a permit, based on how Port Moody actually processes these files.

The permit process is the part of a multiplex project nobody can picture from the outside. The zoning now allows four homes on most Port Moody lots. What happens next: who reviews what, in what order, and how long does it take? This is the road, step by step, as the City actually runs it.

Step 0: feasibility, before anything costs money

Every sound project starts with a quiet question: does this lot actually work? Lot size, transit distance, trees, slope, servicing, and anything registered on title. This is desk work. It costs nothing but attention, and it catches unworkable projects while they are still free to abandon. The inputs are covered in reading what your lot can hold and the five feasibility checks.

Step 1: design

A designer or architect turns a unit count into a site plan. The building has to fit the City's envelope, meaning setbacks, height, lot coverage, and floor area, and it has to respect the lot's realities, such as protected trees or grade. This stage typically runs weeks to a few months. Accurate survey data at the start saves real time later.

Step 2: the Minor Development Permit

Port Moody reviews SSMUH projects through a Minor Development Permit, or MDP. The City checks the design against its bylaws and design guidelines: setbacks, coverage, parking, landscaping, and tree retention. It is a staff-level, technical review. There is no rezoning, no council hearing, and no vote on the project.

Key fact

The word to hold onto is minor. An MDP is reviewed by City staff against written rules. The neighbours do not vote on a qualifying SSMUH application, and neither does council.

A typical submission includes a site plan, building drawings, a landscape and tree protection plan, and the reports the specific lot requires, such as an arborist report or a geotechnical assessment. Staff review the package, return questions, and the applicant responds. It is a conversation on paper, and the quality of the first submission largely sets its pace.

Step 3: the building permit

Once the development permit resolves, the building permit reviews the technical construction package: structure, fire separations, energy code, and servicing connections. This is the same machinery any significant build passes through, applied to a small multi-unit building. It ends with a permit card in the window.

What the record suggests about timing

Timelines vary with the lot, the completeness of the application, and the City's workload. Months for permitting and a year or more for construction is a realistic frame; weeks is not. The City's development application record shows a steady run of SSMUH files since 2024, on Westmount Drive, Valour Drive, Ioco Road, Glencoe Drive, Mount Royal Drive, and Clarke Street, so the path is well travelled and getting smoother.

Three habits consistently speed files up:

Where to start

Read the City's SSMUH pages for the current requirements, and confirm the lot's basics before commissioning drawings. For a plain read of one specific property against the current bylaw, a feasibility study is free and carries no obligation.

Common questions

Does a Port Moody multiplex require a public hearing?

No. Qualifying SSMUH projects are permitted outright under the zoning bylaw, so there is no rezoning and no public hearing. The City reviews the design through a staff-level Minor Development Permit, followed by a building permit for construction.

How long does a multiplex permit take in Port Moody?

It varies with the lot, the application's completeness, and City workload. A realistic frame is months across the development and building permit stages, and a year or more of construction afterward. Complete submissions and quick responses to staff questions are the two biggest time-savers.

What documents does an SSMUH application need?

Typically a survey, site plan, architectural drawings, and a landscape and tree protection plan, plus lot-specific reports such as an arborist report or geotechnical assessment where conditions require them. The City's SSMUH pages list current requirements.

Can owners stay in the house during the application?

Yes. The paperwork stages happen while normal life continues. If the project replaces the existing home, moving out only becomes necessary when demolition and construction begin.

Sources

All articles

Your lot

See what yours can hold.